  第一次 翻译这么长的东西,做个纪念吧! 好长的,不惜找能不能全


  1. 投标须知


  定义: Tender:以下称 为招标人或业主;


  bidder:以下称 为中标单位或中标人。

  1.1. the bidder must have a building construction license above 2nd rate qualification, it must be independent legal company, and it must have received the bidding invitation


  1.2. the design drawing refer to all the current design drawings and all the modification ,revise for related to this drawings.


  1.3.all the data and document that provided by tender is all the data and document that can be used by bidder currently. The tender will not be responsible for any inference , understanding and conclusions .


  1.4.the quotation should include all the cost to finish the project according to the tender document required. Include but not only sub-project cost, project measure cost, construction cost, other project cost and fees, the taxes and all the cost for the acceptance of this project, such inspection fees, testing fees, and appraisal fees.

  1.5 the bidder should have a visit to construction site to understand fully the status of construction site, the road, the storage space and loading and unloading limitation and other factor that can affect the price of project. Any claims and application of extension for project time will not be approved.

  1.6 The bidding price is fixed(unless otherwise stated),The price will not be adjusted for any change of labour price ,material price and some government regulation


  1.7the main material supplier and sub-contractor must be approved by tender(it should be confirmed before sign the general contractor. The bidder work as a general contractor and should be responsible for tender


  1.8 Winning bidder shall fulfill contractual obligations to complete the construction , the bidder is forbidden to t transfer the winning project to others


  2. Bidding fees


  The bidder assume all related cost to complete the bidding document and deliver the bidding document.


  3. Bidding deposit


  3.1 the bidder should submit 50krmb to work as bidding deposit, this bidding deposit is part of bidding document. It should be delivered before submit the bidding document. 投标单 位应提供五元的投标保证金,此投标 保证金是投标文件的一个组成部分,在投标前递交。


  3.2 the bidding deposit should be telegraphic transformed at 4days before the end of bidding day(the transformed address can see the email)投标保 证金在开标时间的前四天内电汇(地址详见电子邮件),, the bidder can submit the modification and recall the bidding document in written application. The bidder can not modify the bidding document after end of bidding day.投标人 可以在递交投标文件后,在规定 的投标截止时间之前,以书面 形式向招标人递交修改或撤回其投标文件的通知。在投标截止日期以后,不能更改投标文件。


  8. open a bid开标


  8.1. opening of bid is organized and host by tender. The bidding document will be checked to make sure all the bidding document is sealed.开标由 招标人组织并主持。开标前 要求对投标文件进行检查,确定它 们是否密封完好。但规定 提交合格撤回通知的投标文件不予开封。


  8.2. any one of the following may lead the bidding document to be invalid:投标文 件有下列情况之一者将视为无效:


  8.2.1. the bidding document is not sealed as requirement投标文 件未按招标文件要求密封;


  8.2.2.not sealed with company seal and not signed by legal representative未经法 定代表人或授权委托人签署或未加盖投标人公章;


  8.2.3. business license and construction license can not satisfy the requirement of tender document营业执照副本(原件),施工资质证书副本(原件)不符合招标文件。


  8.2.4. the bidding document is submit later than the end of bidding days.投标截 止时间以后送达的投标文件。


  8.3. the project team organized by CGT will review the license , organization structure of bidder , the achievement and experience of the project manager and the employee that will take part in this project. And will review the promise of construction quality and technical plan, the service, the quotation , the understanding for the working drawing. And make a comparison to all the above. The winning bidder will be decided based on the result of this comprehensive evaluation. 由加通 项目组通过对投标人的资质、组织机 构及参加施工的项目经理和各专业主要人员的经历和业绩、施工质 量和控制措施的承诺、服务、报价、图纸理 解深度等方面进行评价和比较,确定中标候选人。根据最 终综合评价的结果选定中标人。


  8.4. the CGT project team will not make evaluation and comparison to the bidding document that comply with requirement of tendering document评标小 组仅对符合资格要求并实质上响应招标要求的投标文件进行评价与比较。


  8.5. the lowest quotation will not be a promise to win the bidding.投标单 位的最低报价不做为中标的保证。


  8.6. the tender will not return the bidding document to lose the bidding, and will not make explanation for that.未中标单位,招标单 位不退还投标书,对未中 标原因不做任何解释。


  8.7. the tender will send a bid-winning notification to winning bidder in 5 days after the winning bidder is decided , no notice to losing bidding bidder.中标单位确定后,五个工 作日内向中标单位发出中标通知书,不另行 通知未中标单位。


  8.8. the winning bidder and the tender will signed the construction contract in 3 days after the winning bidder receive the bid-winning notice. All the terms and condition in the tender document and all the promise in the bidding document will be a basic principle for the construction contrac.收到中 标通知书三日内,中标单 位与招标单位依照有关规定,签订施工合同,本招标 文件中的所有条款和投标人在投标书中的承诺即成为招标单位与中标单位签订合同的基本依据。


  